Application of BAUER Dive Drill C40 for relief drilling to reduce the friction whilst pile driving.
Installation of a monopile foundation for a tidal turbine by using a BSD 3000 underwater drilling rig. Grouting of the 23 m long pile in an 11 m deep rock socket, 2.30 m in diameter, using high-strength mortar.